Once I finished the demolition I started with the rebuilding. The first step was to get the shower ready for tile. This meant patching in a 3-piece PVC drain onto an exisiting copper drain pipe. To do this, I cut off the old drain, and soldered on a threaded adapter to attach to the PVC. This was my first shot at soldering pipe, and I’m pretty happy with how it turned out.
Categories
Links
Projects
December 2024 M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31