The sheetrock in the rest of the room looked in pretty good shape so I decided to just patch it up a bit instead of replacing it. This piece covers up the plumbing and the hole where the old medicine cabinet was. The only other piece I needed was to cover up the old toliet paper holder, which was recessed. Getting the holes for the piping in the right spots was a bit tricky, but it really doesn’t matter since the vanity will go in front of that hole area.