The sheetrock in the rest of the room looked in pretty good shape so I decided to just patch it up a bit instead of replacing it. This piece covers up the plumbing and the hole where the old medicine cabinet was. The only other piece I needed was to cover up the old toliet paper holder, which was recessed. Getting the holes for the piping in the right spots was a bit tricky, but it really doesn’t matter since the vanity will go in front of that hole area.
Categories
Links
Projects
November 2024 M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30