Dusty

I hadn’t wanted to do any more spackling without the grout being done, for fear that the spackle would get into the grout lines.  Now that its all finished though, I finally got back to spackling.  The biggest challenge was the transition from the cement-board to the sheetrock.  The Durock was about 3/16 higher than the sheetrock so I had to feather that out with a significant amount of joint-compound.   I also had to tape up the corners, which although it went a bit better than the first time I did it on the wall in the bedroom, it still was tricky, and didn’t end up looking that good.

Granite Countertop

The guy came from Westwood Tile and Stone  today to install the granite countertop for the vanity.   The vanity looks great now, and the guy did an excellent job installing it.  However he was pretty much the only part of our dealings with Westwood that I was particularly pleased with.  Although there weren’t any huge problems, there were a bunch of minor issues that would prevent me from using them again.   In addition to the granite, we also bought the tile from Westwood.  On our first trip to the store, we worked with a very nice gentleman who was very helpful and informative.  However when we went back the second time to look at the granite, he wasn’t there so we worked with another saleswoman, who was much less helpful.   We spent alot of time being concerned that they weren’t gonna get the granite to be the right size.  It wasn’t until the next time that she mentioned that they would come out and make a template.

When we went the third time to make the final decisions on the tile, and to pay for everything, we once again got a different saleswoman.  We picked out the tile we wanted, and also the trim tile.  She never mentioned that the trim tile was a eight of an inch thicker than the field tile.  (Fortunately I was able to put a thinner coat of thin-set on and it looks alright)  When the tile came in we never got a call about it, I had to call and find out that it was waiting for us.  Lastly with the granite, the holes for the faucet were not countersunk, so the fittings for the faucet didn’t fit through. 

 It all ended up working out ok,  and perhaps most of the stuff is things I should have already known.  However the tile and granite cost a small fortune, and I felt that for that price we should have gotten a little better service. 

Finished up grouting

groutfloor.JPG

Been extra busy this week, trying to get ready for the granite counter-top to arrive on Friday.  We  finished up most of the grouting today.  On the floor we choose to use a ‘latte’ colored Spectralock grout.   We were quite scared when the grout first went it, as it looked very light, and rather pink.  However it darkened as it dried, and although I think it might be a bit better if it was a shader darker still, I’m still quite happy with how it looks.   For the floor we mixed up two mini-units of grout, and then put half in the freezer while doing the first half.   After I finished the first half, which was getting difficult to work with, I pulled the second out and it was still nice and soft.  After finishing up, I took the remaining lump and put that back into the freezer, in case I found any spots we missed.

Grouting

grouted.JPG

With the tile all laid, we started doing the grout.  We’re using an epoxy grout, specifically, Laticrete SpectraLock Grout.   I was quite nervous to do the grouting, as I’d never done it before, and really didn’t want to mess up our wonderful tile.   After reading about the SpectraLock all around the web (especially over at the John Bridge Tile Forums) it seemed like the best choice and sounded pretty easy to install.   It went  up pretty easily, all though it was a very time consuming process.  I pretty much followed the instructions, although I used a micro-fiber cloth to clean up the grout haze.   I did end up dropping alot on the floor while doing the walls, however I had laid down some clean cardboard, so it was easy to salvage what had fell.  I suspect someone with more experience could do it faster, however you still need to go back twice to clean it up so you need to leave a good chunk of time to do it.

I’ve done two of the ‘mini-units’ they sell at Lowes so far.  I was very happy to find that you can’t see the joints between each day at all.  I’m a bit disappointed with the coverage, although its pretty much in-line with whats on the package.  I originally bought one for the walls and one for the floor,  but its going to end up taking five for the walls and two for the floor.  Not to big a deal, but the stuff is like 25 bucks a unit.  The end result however, looks fantastic.

Tiling is done!

tilefinished.JPG

Well after about a month or so of working on it, we’ve finally finished all the tiling.  I severely underestimated just how long doing all the tiling would take.  Mostly I didn’t realize how irritating cutting the tiles would be.  Laying the tiles in the middle of the walls and floors is really quite simple, however properly measuring, and then properly cutting the tiles for the edges was both difficult and tedious.  Complicate this with the problems I had with my tile saw, and it ended up taking alot longer than I would have liked.  Regardless, the tiles are all in now, and I’m quite happy with how they look.  There are a few that aren’t as flat as I would like, and a few that aren’t perfectly even.  But for our first time laying tile I think we did a wonderful job.

Border Tile

border.JPG

The copper border tiles we ordered finally came in a few weeks ago.  To accent the main tiles we decided to put a 3″ border of tiles around the shower.  We looked around and picked out the Sonoma Tilemakers MoSuprema 1×1 tiles in Heritage Copper.  We really liked the look of these tiles,  the glaze is actually copper and it looks great next to the gloss of the main tiles.  The tiles were extremely expensive though, about $60 a square foot.  Fortunately we only needed three sheets, so it wasn’t to big a deal. 

I was rather disappointed with the tiles when they arrived.  It seems that these days, handmade is just an excuse for poor quality.  On a handful of the tiles, the glaze looked poorly mixed and the tiles really looked quite bad.  A few others looked like they had gotten big nicks in them before they were glazed, and then a significant number of them had ledges on the bottom, such that they wouldn’t lie flat.   I was fortunate to notice the first two problems before installing them, and pick those out.  The last one however made installation quite difficult, and has resulted in some unevenness that I’m not happy about.  The back of the tiles were covered in two layers of paper mesh, which in some spots covered almost all of the back of the tile, and I was worried that they wouldn’t adhere well.  Fortunately after tediously removing one layer, they seem to be ok.   Despite all these problems they do look incredible  and really add some character to the bathroom.

Tile Removal

tile-removal.JPG

We’re slowly making progress with the tiling.  We’ve got 3/4 or so of the tile up now, however yesterday I realized that two tiles had to come down.  I was a bit over anxious and didn’t realize that the corner shelves we are installing will require not just the closest tile to the corner to be cut, but also the one next to it.   Without a way to cut the tile on the wall, I was forced to remove the tile and put a new one up.  The good news is that the tiles are adhering to the Durock extremely well.  The bad news is that the tiles are adhering to the Durock really well :-/.  I first tried chiseling off the tile, and ended up taking most of the cement board with it.  On the second tile I tried breaking up the tile and trying to remove small pieces at a time.  This left more of the Durock in place, however it also broke it up so that after removing the tile I had to cut out the damaged pieces of Durock.   I plan on patching the hole with a few coats of thinset and fiberglass tape, and hopefully this will create a stable surface for the replacement tile.

Tile Floor

tilefloor.JPG

This weekend I started laying the tile for the floor of the bathroom.  I’d been on hold for a few days waiting for a new blade for my tile saw.  The tile looks great, and I really like the diamond pattern, although it is a bit more difficult to put down in this fashion.  I’ve also found that I’m getting better at laying the tile, and that laying tile on the floor is significantly easier than laying it on walls.  I’ve also found that instead of mixing the thin-set in a big square-ish bin thing (Picture), if I mix it in a small 5lb joint-compound bucket, I can use the drill mixer to quickly and easily mix up a batch.  While this probably wouldn’t be a big enough batch for a more skilled tile setter, for me its perfect.  This small bucket is much easier to move around, and cleanign it up takes only a minute as opposed to the lengthy and messy process of cleaning the other bin.